
John Watts, senior project engineer, walks between a high pressure/intermediate turbine, right, and low pressure turbine, left, at Entergy's Orange County Advanced Power Station, a 1,215-megawatt facility under construction, Monday, Feb. 24, 2025, in Orange, Texas. (AP Photo/David J. Phillip)